Project · Borg Havn IKS

The Horizon 2020 project E-LAND

Multi-vector energy management, with island mode as the starting point.

The technology partners in E-LAND developed tools for multi-vector energy management, with an emphasis on island mode. The project had pilots in Romania and Spain in addition to Borg Havn.

To fulfil its role as a pilot, Borg Havn procured a battery system, a large solar plant and EOS/SCADA. Control of these components was established, along with a thermal system located at Batteriretur, in a building leased from Borg Havn.

Facts

  • Customer: Borg Havn IKS
  • Duration: January 2020 to December 2024
  • Pilots in Norway, Romania and Spain
  • Battery system, solar plant, EOS/SCADA and thermal system
  • Per Olav Dypvik was responsible for Borg Havn's participation
Horizon 2020 E-LAND, Energy Islands Project description at elandh2020.eu

The most demanding parts

Control reaching into critical infrastructure

One of the most demanding tasks was establishing external power and energy management when the equipment being controlled is part of critical infrastructure in a secured network. This places strict requirements both on how the control is connected and on who is able to influence it.

Several energy carriers in one facility

Multi-vector means that electricity and heat are handled by the same control system. Borg Havn's pilot included a battery system, solar generation and a thermal system, which together made up a facility where several energy carriers had to work in concert.

Per Olav Dypvik

Energea AS